The main floor is truly in tatters now. Electric has been installed and left a patchwork of holes in the kitchen. The floors are being demolished. Aside from a leaky washer faucet we have been lucky to find no major problems.


They think the floor demo will be done today and they can start laying down the new wood. Then three passes of sanding, then stain and finish. If we stay on schedule it will be done by Friday next week.

This is how we live now.


We are lucky to have a comfortable basement with a mini sink and fridge. I sort of feel like I’m living in the dorms again :-). We even have a long trek to the bathroom like the dorms, which is two levels above us now. In the mornings I prepare breakfast downstairs, then carry it on a tray to the little masters upstairs. They eat in their toy room before dressing for school. This system works well, but emphasizes my servent role. I imagine myself in black and white uniform as I carry the tray up, expecting Mrs Crawley at the top.

Save