The reconstruction team has come and made an official estimate, that our insurance company has accepted. The floor guy came this morning to take measurements and inspect the existing materials. I should be hearing from my guy early next week about a schedule for drywall, texture, painting, and plumbing. We’re looking at being done before Thanksgiving even if there are some minor hiccups.
I had the mitigation company take out all the plastic tarps so we can enjoy the full room again. Despite the powder room displacement to the living room, I’m happy to have the walls down and the sunlight streaming in. The kids IMMEDIATELY starting running circles around the house again. I didn’t realize how much they loved and missed their first floor race track loop.
Leave a Reply